
12-16-2007, 12:02 AM
|
 | Hazardous Waste | | Join Date: Sep 2006 Location: South Central kansas
Posts: 5,787
:
| |
| 2004 – 2008 Titan And Armada; Changes To Flat Rate Time For Some Engine Valve Train R This is good news for anyone going in to the service department for top end problems so don't get taken to the cleaners. The service procedures for some valve train components on the Applied Vehicles have changed; engine removal is not required and that step was deleted from the procedures. • The revised procedures are included in the most recent versions of the Service Manuals for these vehicles. The most recent versions are on ASIST. • Due to the revisions of the service procedures, Flat Rate Times (FRTs) have also changed. • A listing of the Op-Codes with the revised FRTs is included on the next page of this bulletin. • These new FRTs will be effective on and after August 27, 2007. NOTE: |