View Single Post
  #6 (permalink)  
Old 10-15-2006, 09:19 PM
steves's Avatar
steves steves is offline
Titanholic
 
Join Date: Sep 2006
Location: PA
Posts: 2,791
Better than a raised floor, do it like they would do a server room, with regular raised flooring. Something like this? http://www.accessfloorsystems.com/access/sys/

You would only need like what 6, 7" at most? You could run all your power and vac needs below the floor, and have the added benefit of having an exteremly level floor after it's all installed.

Don't forget to leave space for the kegerator, big screen tv, and hot tub.
__________________
05 KC SE Smoke
01 Suzuki 600 GSF
88 Fiero 2M4
Reply With Quote