Had a pretty good weekend with no rain so I got the window sealed up both inside and out, installed 4 temporary
T8 lights I got at Lowe's, reattached the original corrugated siding where I had to remove studs to frame the window in and got started on the siding. It's suppose to rain Monday and Tuesday but I hope to have the north side and the roof done by the end off this coming weekend and be laying the floor by the 4th of July but I have to dig a hole first for the sewer line I plan to run out to the septic tank for my Bathroom. (I'm going to buy a porthole for the bathroom so I can honestly say I finally have a pot to pee in and a port hole to throw it out of.)
When I get to the top with the siding I'll shut off the power and disconnect the power line going inside to the breaker box and install the new box I bought.