Had a pretty good weekend with no rain so I got the window sealed up both inside and out, installed 4 temporary T8 lights I got at Lowe's, reattached the original corrugated siding where I had to remove studs to frame the window in and got started on the siding. It's suppose to rain Monday and Tuesday but I hope to have the north side and the roof done by the end off this coming weekend and be laying the floor by the 4th of July but I have to dig a hole first for the sewer line I plan to run out to the septic tank for my Bathroom. (I'm going to buy a porthole for the bathroom so I can honestly say I finally have a pot to pee in and a port hole to throw it out of.)

When I get to the top with the siding I'll shut off the power and disconnect the power line going inside to the breaker box and install the new box I bought.
Attached Thumbnails
Squids Shop Blog-hog-069.jpg   Squids Shop Blog-hog-073.jpg  
Reply With Quote
 

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73