The rain held off long enough to get the window on the North side installed this weekend, allowing me to finish installing the Purlons (nailing strips) for the siding. I wasn't going to put a window in because it is on the North side but after spray painting a window on the side and studying it for a couple of weeks I decide what the heck, and went and got the most efficient Pella window they make.
Hopefully (Depending on the rain) I'll be able to get the siding and roof on this week. Since I started this project the weather has been wacked and it's taken me 3 times as long as it should have to get the work done on the outside but I'm almost there.
Attached Thumbnails
Squids Shop Blog-window1.jpg   Squids Shop Blog-window-044.jpg   Squids Shop Blog-window-047.jpg   Squids Shop Blog-window-046.jpg   Squids Shop Blog-window-035.jpg  

Reply With Quote
 